Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> sueizt,ce, eKccuirtijion Uul ti c otss 5f frb(4a�o)CNrn <br /> Ili% l0 X h , ci t) 1c it Iri C '4o a�)uw j4o4.hL 1`S . <br /> 26 - 14 s aaj UP i° 15It- mess f0a5 I big <br /> (,cyci cu (f o i deiiik.f& (ou 1 dreg ftek5. wliich MC J <br /> sti dAr improved 4-0 rl d ‘Ccce s (rica J blc4eer-c local j <br /> (la at Of e/(0 Si Old avuiefs) <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes,diameter,depth,location,etc. Submit additional <br /> pages if necessary: Na DiZILLI NCI <br /> A. Drill Pads: <br /> Average Average <br /> Quantity Width (ft) Length(ft) <br /> B. Drill Holes: <br /> Diameter <br /> Quantity Depth (ft) (in) <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> Utibea,GDUND &ENL NCI <br /> Form 2-Public File Page 6 of 14 <br />