Laserfiche WebLink
Scraper Worksheet Cont'd Task#003 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Spread topsoil in main permit area <br /> Site: Lascar Pit Permit Action: 2024 inspection Permit/Job#: M2023005 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 9/27/2024 County: Huerfano Filename: M005-003 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 627G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 12M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA 25 25 <br /> Ownership cost/hour: $217.39 NA NA NA $69.16 $11.65 <br /> Operating cost/hour: $257.76 NA NA NA $13.69 $5.61 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Ripper op.cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA NA NA $27.76 $21.12 <br /> Unit Subtotals: $506.05 NA NA NA $110.61 $38.39 <br /> Number of Units: 2 0 0 0 1 1 <br /> Group Subtotals: Work: $1,012.10 Support: $0.00 Maine $149.00 <br /> Total work team cost/hour: $1,161.10 <br /> MATERIAL QUANTITIES <br /> Initial volume: 14,422 CCY Swell factor: 1.000 <br /> Loose volume: 14,422 LCY <br /> Source of estimated volume: Main permit acreage minus access road,4"topsoil <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Earth-Loam Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 25.14 LCY Adjusted Capacity: 18.85 LCY <br /> CIRCES Cost Estimating Software <br />