Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclamation Cost Estimate,Lascar Pit,2024 Update <br /> Site: Lascar Pit Permit Action: 2024 inspection Permit/Job#: M2023005 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 9/27/2024 County: Huerfano Filename: M005-000 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Pit hi hwall reduction and regrading DOZER 1 2.29 $737 <br /> 002 Ripping access road RIPPER 1 4.17 $1,437 <br /> 003 S read topsoil in main permit area SCRAPERI 1 14.29 $16,590 <br /> 004 Spread topsoil over access road SCRAPERI 1 2.53 $3,547 <br /> 005 Reve etation REVEGE 1 30.00 $55,650 <br /> 006 Mob/Demob MOBILIZE 1 4.34 $8,350 <br /> SUBTOTALS: 57.62 $86,311 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,743 <br /> Performance bond: 1.05 Total= $906 <br /> Job superintendent: 28.81 Total= $2,284 <br /> Profit: 10.00 Total= $8,631 <br /> TOTAL O&P= $13,565 <br /> CONTRACT AMOUNT(direct+O&P)= $99,876 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $4,245 <br /> Reclamation management and/or administration: 5.00 $4,994 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $23,303 <br /> TOTAL BOND AMOUNT(direct+indirect)= $109,614 <br />