Laserfiche WebLink
Mobilization Worksheet Cont'd Task#006 Page 2 of 2 <br /> Subtotals: $270.61 $270.61 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: WALSENBURG <br /> Total one-way travel distance: 13.00 miles <br /> Average Travel Speed: 55.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $8 222 29 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $127.92 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.24 0.24 <br /> Return Time(Hours): 0.24 0.24 <br /> Loading Time(Hours): 0.85 NA <br /> Unloading Time(Hours): 0.85 NA <br /> Subtotals: 2.17 0.47 <br /> JOB TIME AND COST <br /> Total job time: 4.35 Hours <br /> Total job cost: $8,350 <br /> CIRCES Cost Estimating Software <br />