My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-14_REVISION - M2023005
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2023005
>
2024-10-14_REVISION - M2023005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 8:48:06 AM
Creation date
10/14/2024 9:41:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2023005
IBM Index Class Name
Revision
Doc Date
10/14/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Baxter Kirkland - Siete, Inc.
Type & Sequence
SI1
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#004 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 0.70 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 6093 feet <br /> Scraper Push Dozer Source <br /> Altitude Ad': 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Firm, smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (%) (min) <br /> 1 2112.00 -1.20 3.00 1.80 2868 0.90 <br /> Haul Time: 0.90 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (min) <br /> 1 2112.00 1.20 3.00 4.20 2849 0.87 <br /> Return Time: 0.87 minutes <br /> Total Scraper team cycle time: 3.07 minutes <br /> Adjusted for job conditions: 305.78 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 611.55 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 611.55 LCY/Hour <br /> Unadjusted unit production/hour: 368.40 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 2.53 Hours <br /> Unit cost: $2.290 /LCY Total job cost: $3,547 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.