Laserfiche WebLink
The reclamation slope face and crest shall be cut to the lines and grades shown on the detail drawings. After <br /> the embankment is brought to final grade,the slope shall be compacted and finished by tracking a D-8 <br /> Caterpillar(or approved equivalent)bulldozer up and down the slope. The crest shall be grade to match the <br /> slurry wall mixing pad topography. <br /> END OF SECTION <br /> Section 02290-Page 6 of 6 02/18 <br />