Laserfiche WebLink
The condition, practice or violation is causing or can reasonably be expected to cause significant <br /> imminent environmental harm to land, air,or water resources. <br /> The Permittee or Operator has failed to abate violation No. CV-2024-001 included in Notice of <br /> Violation No. CV-2024-001 within the time for abatement originally fixed or subsequently <br /> X extended. <br /> Operation(s) to be Ceased Immediately: <br /> The entirety of the disturbed and affected land within the permitted boundaries. <br /> STEPS NECESSARY TO ABATE VIOLATION(REMEDIAL ACTION): <br /> Abatement Step# Description <br /> 1 New Elk Coal Company,LLC. shall submit to the Division for inclusion in the permit application, <br /> a certificate certifying that the applicant has a public liability insurance policy in force for the <br /> surface coal mining and reclamation operation. Or, in lieu of a certificate for public liability <br /> insurance policy, satisfactory evidence that NECC has satisfied applicable State or Federal self- <br /> insurance requirements in accordance with Rule 2.03.9. <br /> TIME FOR ABATEMENT(NOT MORE THAN 90 DAYS): <br /> ON OR BEFORE last abatement due date <br /> Abatement Step# Due Date <br /> 1 September 28,2024 <br /> Affirmative Obligation(s)to Abate Imminent Danger or Harm, if Applicable*: <br /> * If imminent danger to public health and safety or imminent environmental harm is found to exist. <br /> Page 4 of 4 <br />