My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-09-20_REVISION - M1980038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980038
>
2024-09-20_REVISION - M1980038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 2:07:58 PM
Creation date
9/23/2024 7:54:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980038
IBM Index Class Name
Revision
Doc Date
9/20/2024
Doc Name
Request For Conversion
From
Dolores County Road & Bridge Department
To
DRMS
Type & Sequence
CN1
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Determ- Assigned Specialist <br /> ination Resource Rationale for Determination. Initials Date <br /> (N)J. Seebach JJB-There is no surface water present,and no communication <br /> (N)Project Lead with the water table due to impermeable Mancos Shale beneath <br /> the gravel. There are no drinking water consumers within <br /> several miles or down-gradient from the pit. <br /> JAS—A stormwater pollution prevention plan(SWPPP)would be <br /> prepared prior to mining in compliance with Section 402 of the <br /> Clean Water Act and would describe measures to minimize <br /> erosion and prevent soils from leaving each site during mining <br /> activities.The measures outlined in the SWPPP would stabilize <br /> Water disturbed areas during and after mining. 3/19/2021 <br /> NI Resources/Quality JJB <br /> (drinking/surface/ JAS 6/13/2024 <br /> ground) El Mitigation: <br /> • Pit should be designed to have no overland flow enter <br /> or leave the project site.This may entail constructing <br /> ditches on the uphill side of the pit to move water <br /> around the pit and constructing a berm on the <br /> downhill side to ensure no water leaves the pit during <br /> heavy precipitation events. <br /> • Site should be inspected periodically to ensure that <br /> berms,ditches,and other BMPs as described in the <br /> SWPPP are functioning properly. <br /> (N)B.Wade Would not be allowed on site,except for in vehicles.A port-a- <br /> (N)Project Lead potty is permitted during crushing operations and must be <br /> NI Hazardous removed after crushing completion. JJB 3/19/2021 <br /> Materials BCW 5/15/2024 <br /> ❑ Mitigation: <br /> (N)Project Lead Reviewed the soil survey for the site.Resource is not present. <br /> NP <br /> (Prime o lands Unique)(❑) JJB RL <br /> 3/19/2021 <br /> El Mitigation: <br /> (N)Project Lead JJB-Topsoil has already been removed and stockpiled from <br /> (N)J. Seebach the pit and would be replaced upon reclamation. <br /> JAS-A stormwater pollution prevention plan(SWPPP)would <br /> be prepared prior to mining in compliance with Section 402 of <br /> the Clean Water Act and would describe measures to minimize <br /> erosion and prevent soils from leaving each site during mining <br /> activities.The measures outlined in the SWPPP would stabilize <br /> disturbed areas during and after mining.Design features would JJB 3/19/2021 <br /> NI Soils address concerns about the resource within the project area. <br /> JAS 6/13/2024 <br /> ❑ Mitigation: <br /> • The site shall be inspected periodically to ensure no <br /> erosional features are forming at the site and if <br /> discovered,stabilized at the earliest practical time. <br /> • During reclamation of the site,all final slopes shall be <br /> 3:1 or less unless it can be demonstrated impractical <br /> for discrete areas beforehand with the concurrence of <br /> BLM. <br /> Disappointment Valley Gravel Pit Expansion EA DOI-BLM-CO-S010-2024-0021-EA <br /> Tres Rios Field Office <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.