My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-09-18_PERMIT FILE - M2024035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024035
>
2024-09-18_PERMIT FILE - M2024035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 10:39:33 PM
Creation date
9/18/2024 2:09:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024035
IBM Index Class Name
Permit File
Doc Date
9/18/2024
Doc Name
Incompleteness Response
From
Bad Boys of Cripple Creek Mining Co, LLC
To
DRMS
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 9�'s��z'f and completion: 9/' za z q <br /> 2) How many years is the mine anticipated to be operational: years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (14) all-yearlong or (D seasonally, explain: <br /> 4) How many aces of the mine site will be disturbed at any given time: acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> =4-6 inches =6-8 inches <br /> 8-10 inches =10-12 inches <br /> = Other: <br /> N/A, explain: 4 caoRvI r-4 Tm ✓e_L•asa At' So,L cer!✓ee vAV-fJ 7_A'A '* I.s Are Taps-11- Ar-TA4 sr�� <br /> 6) Will you need to move any overburden (check one): (_E]�)Yes or(F-1 )No <br /> a. If yes,approximately how thick is the overburden? 107- — 2-- feet <br /> 7) How will the mine be accessed: (_� existing roads (f�l) new roads will be created <br /> Please describe the existing roads: <br /> OAf11L L/dk 4,45& AL--W ��R�GTCy DntT BA�dPysoFC�trrft� P�Et��rI✓(OU <br /> 1°go06 QT/ <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> 8) Will water be needed during the mining operation (check one): (f2)Yes or ( )No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (-a)Yes or(1)No <br /> a. If yes, please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process (check one): (-a)Yes or( No <br /> a. If yes, please describe the chemical types and quantities to be utilized, chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.