Laserfiche WebLink
All topsoil removed will be replaced as plant growth medium. Applicant expects 6 <br /> to 12 inches of topsoil will be removed, as practicable. All topsoil will be evenly <br /> distributed over the areas from which it was removed in thicknesses equal to the <br /> original topsoil depths found at the site. Prior to removing topsoil, applicant shall <br /> determine available soils sufficiently to establish quantity and quality in order to <br /> ensure consistency during reclamation. <br /> CoProp LLC—Rodeo Dunes Mine Page 6 of 6 <br /> Construction Materials Regular Operation(112(c))Reclamation Permit Application Form <br />