My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-09-17_REVISION - M2010004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010004
>
2024-09-17_REVISION - M2010004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2024 8:23:09 AM
Creation date
9/17/2024 9:49:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010004
IBM Index Class Name
Revision
Doc Date
9/17/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Frank Leone Jr. - Leone Sand & Gravel LLC
Type & Sequence
SI1
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#003 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Spread Topsoil 6-in over 26.05 acres <br /> Site: Leone Huerfano Gravel Pit Permit Action: 2024 Inspection Permit/Job#: M2010004 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 8/23/2024 County: Huerfano Filename: M004-003 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS XR Series II <br /> Horsepower: 240 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $90.24 NA <br /> Operating Cost/Hour: $78.95 100 <br /> Ripper own. $9.25 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.26 5 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $217.29 <br /> Total Fleet Cost/Hour: $217.29 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 21,014 <br /> Swell factor: 1.000 <br /> Loose volume: 21,014 LCY <br /> Source of estimated volume: 26.05 acres of 35.27 acre total dist. needs topsoil <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 300 feet <br /> Unadjusted hourly 311.1 LCY/hr <br /> production: <br /> Materials consistency description: Partly consolidated stockpile 1.1 <br /> Average push -5 % <br /> gradient: <br /> Average site altitude: 6,200 feet <br /> Material weight: 1,600 lbs/LCY <br /> Weight description: Top Soil <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.