Laserfiche WebLink
Mobilization Worksheet Cont'd Task#005 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: PUEBLO <br /> Total one-way travel distance: 49.00 miles <br /> Average Travel Speed: 55.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $3,964.63 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $173.98 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.89 0.89 <br /> Return Time(Hours): 0.89 0.89 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 2.78 1.78 <br /> JOB TIME AND COST <br /> Total job time: 5.56 Hours <br /> Totaljob cost: S4,139 <br /> CIRCES Cost Estimating Software <br />