My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-09-16_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2024-09-16_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 12:44:05 PM
Creation date
9/16/2024 12:40:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/16/2024
Doc Name Note
SL-23 Phase I - III Bond Release Application
Doc Name
Application
From
Colowyo Coal Company L.P.
To
DRMS
Type & Sequence
SL23
Email Name
HR1
Media Type
D
Archive
No
Document Relationships
2024-09-16_REVISION - C1981019
(Attachment)
Path:
\Day Forward\Revision\Coal\C1981019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo Coal Company L.P. <br /> <br />SL-23 Phase I - III Bond Release Application Page 4 <br /> <br /> <br />III. Summary of Reclamation and Management <br /> <br />A. General Description <br /> <br />The areas being applied for bond release are an impoundment (Streeter Pond) and post mine <br />channel (Streeter Ditch). Both structures will remain as a permanent structures post-mine in <br />their current as-built configuration. The 5.5 acres including both structures being applied for <br />bond release are shown on Map 1. <br /> <br />The Streeter Ditch is proposed for Phase I, II, and III bond release from Station 0+00 to 68+41 as <br />shown on Map 1. Design details for the Streeter Ditch can be found in Permit No. C-1981-008, <br />Volume 2C, Exhibit 7 Item 14, and the profile for the channel is located on Map 33. <br /> <br />The Streeter Pond proposed for Phase I, II, and III bond release has been requested by the <br />surface landowner to remain permanently post-mine. Please refer to Volume 1, Section 4.05.9 <br />Impoundments and Volume 2B, Exhibit 3 for additional information pertaining to the surface <br />landowners request. The as-built condition for the Streeter Pond can be located on Figure Exh. <br />7-14P-1. The previously cited information is located in Permit No. C-1981-008. <br /> <br />The ten-year minimum bond liability period is not applicable for a permanent impoundment and <br />post-mine channel. <br /> <br />B. Topsoil Replacement <br /> <br />The applicability of Rule 4.06.4 does not apply to permanent impoundments and post-mine <br />channels. <br /> <br />C. Revegetation Success Demonstration <br /> <br />The applicability of Rule 4.15.8 does not apply to permanent impoundments and post-mine <br />channels. <br /> <br />D. Post-Mining Land Use <br /> <br />The surface landowner has requested to retain the Streeter Pond as a permanent structure on their <br />property, and the Streeter Ditch is a permanent post-mine channel that is designed and <br />constructed to remain in the post-mine surface. <br /> <br />Both the Streeter Pond and Ditch support the post mine land use of wildlife and rangeland by <br />providing a water conveyance structure and water source post-mine. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.