Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings,ponds,etc. <br /> Rig will be leveled using the rigs hydralicls, so no pad needed. Mud pits will be <br /> excavated and backfilled on completion. Drill holes will be cemented on completion. <br /> The area is sufficiently flat that no roads are anticipated. Acces disturbance, <br /> approximately 300 feet, wiill be leveled to original surface and reclaimed. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes,diameter,depth,location,etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 0 Width (ft) Length(ft) <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 5 Depth(ft) 5000 (in) 12 <br /> C. Mud Pits <br /> Average Average Average 10 <br /> Quantity 5 Width(ft) 10 Length(ft) 20 Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> none <br /> Form 2—Public File Page 6 of 14 <br />