Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil is from 0-3 nches, with most of in draws. No holes are planned in any <br /> draw. <br /> If encountered, it will be stockpiled and replaced after completion. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Drill chips not used for sampling will be returned to hole before plugging <br /> Bottom_of hot/a 20 feet b. low,sAface will be filled with bentonite then <br /> cemented to surface <br /> 5. Describe how portals,adits,shafts, ponds, excavations, or other disturbances will be <br /> reclaimed(refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> All materials brought to surface, except core will be re-filled in ho]e. <br /> Any additional disturbance will he re-contouured <br /> Almost all vehicle travel will be on existing roads. New <br /> significant vehicle tracks will be graded and seeded <br /> Form 2—Public File Page 9 of14 <br />