My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-09-09_REVISION - M1981058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981058
>
2024-09-09_REVISION - M1981058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 10:51:26 AM
Creation date
9/9/2024 10:35:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981058
IBM Index Class Name
Revision
Doc Date
9/9/2024
Doc Name
Request for Technical Revision
From
Livingston & Mumby, LLC
To
DRMS
Type & Sequence
TR4
Email Name
ACY
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Findings of Fact.Conclusions of Law,Ruling of the Referee and Decree of the Water Court <br /> Thomas F.and Ginger L.Latham <br /> 23CW3022 <br /> Page 6 <br /> Based on discussions with a representative of the Division Engineer' Office of Water <br /> Division 5, the call period for the Cameo Call includes three weeks in April, one week in <br /> May, and the last 2 weeks in June through October. A monthly water balance utilizing <br /> historical irrigation credits to offset potential out-of-priority depletions attributed to <br /> evaporation from 4.2 acres of exposed groundwater in the existing pit pond is presented in <br /> Table 8. As shown,the historical irrigation credits will fully offset potential out-of-priority <br /> depletions. <br /> D. Historical Irrigation Return Flows: Historical irrigation return flows must be <br /> maintained to support the use of historical irrigation credits for augmentation. Historical <br /> return flows include both surface and deep percolation. The surface irrigation return is <br /> estimated to be 80 percent of the irrigation return and instantaneous return to the river is <br /> assumed. Deep percolation is assumed to account for 20 percent of the irrigation return, <br /> and the timing of accretion to the Colorado River from deep percolation was estimated <br /> using the Well Pumping Depletion Model (©2001, Western Water Consulting, Inc.). The <br /> resulting irrigation return flow analysis is summarized in Table 9. As shown. historical <br /> irrigation return flow during the call period are maintained by accretions to the river <br /> resulting from historical diversions left in the river. <br /> E. Amounts Needed for Augmentation: The nine-acre dry-up area represents 14 <br /> percent of the 64.2 acres historically irrigated at the Applicants' property. Accordingly, 14 <br /> percent of future irrigation diversions to the Applicants' property will be dedicated for <br /> augmentation use. The amounts needed for augmentation will be 0.80 cfs of the Senior <br /> Larkin Right and 0.40 cfs of the Junior Larkin Right for a total of 1.20 cfs under both rights, <br /> or 2.86 of the Applicants' shares in the Larkin Irrigation Company.Therefore,an additional <br /> three of the Applicants' Larkin Irrigation Company shares will be dedicated for use under <br /> this plan for augmentation. <br /> F. Change Requested: The Applicants request that the water rights represented by the <br /> additional three shares of the Applicants' Larkin Irrigation Company shares be changed <br /> to allot for evaporation from 4.2 acres of the exposed ground ater in the existing pit pond <br /> b) augmentation and replacement. in addition to irrigation uses. <br /> G. Operation of the Plan for Augmentation: During times of a valid downstream call <br /> during the call period. 14 percent of Applicants' share of Larkin Ditch diversions will be <br /> administered in accordance with this plan for augmentation. To meet the obligation to <br /> augment w ith a total of 1.2 cfs under full-supply conditions. 1.08 cfs of the combined <br /> Senior and Junior Larkin Rights, assuming 10 percent ditch carriage loss, will not be <br /> delivered for use on the Applicants' property but will be diverted back to the Colorado <br /> River at or near the Larkin Ditch headgate. The remaining 0.12 cfs will be left in the Larkin <br /> Ditch to make up for carriage losses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.