Laserfiche WebLink
West Elk Mine <br /> <br />2.05-21 Rev. 06/05, 01/06, 03/06, 04/06 & 05/06- PR10; 01/09- MR350; 04/09- TR116; 04/09- MR353; 05/09- MR354; 08/09- TR118; <br />08/09- TR119; 09/12- MR387; 11/12- MR390; 07/18-PR15; 11/18- MR430; MR438- 09/19; MR439- 11/19; 07/20- MR447; 6/22- <br />MR464; 6/22 MR466; 6/22 MR468; 11/22 MR471; 07/23 MR474; 8/23 MR476; 09/23 MR477, 10/23 MR478, MR479, 3/24 MR480, <br />05/24 MR-481 <br />fall of 1997. The ventilation fans and associated buildings, a nitrogen supply facility, mine <br />ventilation air heaters, rock dust supply tank are also located on the Sylvester Gulch ventilation <br />shafts bench. This ventilation facility is located approximately one half mile south of the Sylvester <br />Gulch Fan (Map 53B). Information regarding the design, construction and operation of these <br />ventilation facilities is contained in Exhibit 69. <br />A third ventilation shaft (Vent Shaft #3) was constructed during the summer and fall of 1997. Vent <br />Shaft #3 is a 10-foot finished diameter shaft located approximately 400 feet east of the electric <br />borehole site (Map 53B). Information regarding the design, construction, and operation of the <br />ventilation facility is contained in Exhibit 69. <br /> <br />Sylvester Gulch Mine- Dewatering and Treatment Facilities <br /> <br />MCC designed and constructed mine dewatering and treatment facilities located within the <br />Sylvester Gulch drainage. The system consists of one 18-inch cased borehole, one 16-inch borehole <br />(completed as a 12-inch cased hole), and two 20-inch cased boreholes, completed during the <br />summer of 1997 to access the operational sump in the northeast corner of the 10NE Tailgate of the <br />B seam. Following the completion of ventilation seals on the 10NE and 11NE longwall panels, this <br />area became the NE Panels Sealed Sump. MCC utilizes the sealed sump as a large volume mine- <br />water storage area and pumps the water out of the mine through one of the boreholes to Sylvester <br />Gulch. The smaller borehole serves as a recirculation loop to the sump and the two 20-inch cased <br />boreholes serve as alternate recirculation boreholes and/or boreholes for water level indicators. <br />Refer to the Probable Hydrologic Consequences section of the permit for additional discussion of <br />the sumps. <br /> <br />The treatment facilities include a dewatering pump station and treatment building, an aeration pond, <br />and a secondary settling pond. A detailed discussion of each facility is provided in Exhibit 69, <br />Sylvester Gulch Facilities Area. <br /> <br />Temporary Bathhouse <br /> <br />Facilities necessary to house additional personnel for E Seam construction and development <br />work were installed near Shaft #1 in Sylvester Gulch in late May 2005. These facilities were <br />temporary in nature and designed to be removed when additional staffing is no longer required <br />for E Seam development and construction needs. <br /> <br />All construction and installation work was performed within the existing disturbed areas at the <br />Shafts #1 and #2 area in Sylvester Gulch. There were no changes made to any existing sediment <br />controls, ditches or roads. Surfaces were restored to the existing compacted roadbase when <br />excavations for conduits and piping were completed. All equipment and facilities were placed on <br />the existing surfaces with no concrete foundations except for the two electrical transformers <br />required for the facility. These required a single reinforced concrete slab on grade approximately <br />8 feet wide by 12 feet long. This slab will also be removed when additional staffing is no longer <br />required. <br />