Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-33 Revision Date: 6/24/24 <br /> Revision No.: MR-255 <br />of the permitted disturbance boundary. Please see Maps 19, 19B, and 19C for the permitted <br />disturbance areas. The construction and/or repairs to these ranch roads will facilitate ongoing <br />private landowner activities including ranching, grazing, hunting, and access for other entities <br />which hold right of ways within the permit boundary. These ranch roads activities are not <br />associated with Colowyo’s mining activities, and will not be required to be permitted nor bonded <br />for in accordance with Rule 3.02.1(2). <br /> <br />White River Electric Association (WREA) will construct, operate, and maintain a 69 kV power <br />line from the Axial Basin substation adjacent to State Highway 13 to the Collom facilities area. <br />This power line will be wholly owned by WREA. The ground disturbing activities associated with <br />construction of the power line, including pole locations and roads to pole locations, are not <br />associated with Colwoyo’s mining activities, and will not be required to be bonded in accordance <br />with Rule 3.02.1(2). The power line will service the area post-mining in Collom. <br /> <br />Tri-State Generation and Transmission Association, Inc. (Tri-State) owns and operates the Axial <br />Basin Substation, which provides electrical services locally in the Axial Basin area including to <br />Colowyo. Tri-State will be expanding the footprint of the substation within the permit boundary <br />on the east and west side of the current substation location. The ground disturbing activities from <br />the expansion of the Axial Basin Substation are not associated with Colowyo’s mining activities, <br />and will not be required to be permitted nor bonded for in accordance with Rule 3.02.1(2). <br /> <br />In 2018, approximately 22 acres within Colowyo’s permit boundary (outside of the disturbance <br />boundary) was affected by the wild land fire caused by a lighting strike. The location of the fire is <br />shown on Figure 4.12-6. The area that was burned is mostly comprised of pinyon juniper and low- <br />density sagebrush. Because the fire was not related to Colowyo’s mining activities, Colowyo, as <br />the surface landowner will reseed or managed the post-fire area, as it deems appropriate. <br /> <br />In 2019, the surface landowner replaced a culvert under the Taylor Creek Access Road (please see <br />Map 25C for location of the road) to support long-term access up the Taylor Creek drainage. <br />Minimal ground disturbance was associated with replacing the culvert. Since the activity is related <br />to the surface landowner, it is not permitted and bonded for in accordance with Rule 3.02.1(2). <br /> <br />In 2019, approximately 13.5 acres within Colowyo’s permit boundary (outside of the disturbance <br />boundary) adjacent to the Collom Haul Road was affected by the wild land fire caused by high <br />winds slapping power lines together. The location of the fire is shown on Figure 4.12-7. The area <br />that was burned is mostly comprised of sagebrush. Because the fire was not related to Colowyo’s <br />mining activities, Colowyo, as the surface landowner will reseed or managed the post-fire area, as <br />it deems appropriate. <br /> <br />Tri-State Generation and Transmission Association, Inc. owns and operates a 138kV power line <br />that traversers through the east portion of the permit boundary. The 138kV line runs north to south <br />through the reclaimed East Pit, and just east of the reclaimed Section 16 Pit. To ensure access to <br />all pole locations along the power line for maintenance and emergency repairs, Tri-State will be <br />improving existing ranch roads and/or constructing new roads to access their power line within the <br />permit boundary. Most of this activity will take place south of the reclaimed East Pit and outside <br />of Colowyo’s ground disturbance and reclamation areas. Nonetheless, some of these access <br />locations will traverse across Phase III released areas (Section 16 reclamation areas) and reclaimed