RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-20 Revision Date: 8/21/24 <br /> Revision No.: MR-259 <br /> <br />During the widening of Haul Road A, two light use roads will be constructed at the toe of the <br />Haul Road A to provide access to the Taylor Pump Holding Pond and a water rights diversion <br />structure on Taylor Creek. Both structures will have proper BMPs installed and maintained <br />until construction and stabilization of the light use roads is complete. It is not expected that the <br />light use road will have any short or long term impacts to Taylor Creek. <br /> <br />Two sediment ponds were constructed within the stream buffer zone on Taylor Creek. The West <br />Pit Pond embankment lies within 100’ of Taylor Creek, and the West Taylor Pond was constructed <br />at the base of the West Taylor Fill and makes up part of Taylor Creek. During construction and to <br />date these structures have not created any adverse impacts to Taylor Creek, and both structures are <br />also not anticipated to have any long term impacts to Taylor Creek. <br /> <br />Much of the upper reaches of Taylor Creek above the West Taylor Pond will be directly impacted <br />by the South Taylor Pit, and the permeant West Taylor Fill (see Map 23A). The West Taylor Pond <br />will protect the lower reaches of Taylor Creek that will not be disturbed during mining and <br />reclamation. It is expected that during mining the South Taylor Pit will intercept and hold surface <br />water runoff thus providing less discharge through the West Taylor Pond. Once mining is <br />complete the entire South Taylor Pit will be backfilled and the pre-mine profile and function of <br />the upper reaches of Taylor Creek will be restored. <br /> <br />One best management practice structure (sediment sump) lies within the stream buffer zone on <br />Taylor Creek. This structure manages storm water runoff from the haul road and provides a <br />benefit to Taylor Creek by capturing stormwater runoff from the haul road. This structure is not <br />anticipated to have any impacts to Taylor Creek, and provides a benefit in protecting stormwater <br />runoff to Taylor Creek. <br /> <br />The Taylor Pump Holding Pond was constructed within 100’ of Taylor Creek. The Taylor Pump <br />Holding Pond is utilized to manage water movement from Wilson Reservoir to the active <br />operation; therefore, an underground water pipeline that transports water to and the from the <br />Taylor Pump Holding Pond was also constructed at various locations within 100’ of Taylor <br />Creek as shown on Map 10C. Neither of these structures has impacted Taylor Creek, and neither <br />structure is expected to have any long term impacts to Taylor Creek. <br /> <br />A water diversion structure is constructed in Taylor Creek that allows Colowyo to divert water <br />from Taylor Creek to exercise a water right. This structure would be utilized even if mining was <br />not occurring at Colowyo, as Colowyo is the private surface landowner utilizing a privately held <br />water right structure. <br /> <br />A light use road that was a premine “ranch” road follows along Taylor Creek. This road is <br />utilized to access the West Pit, East Taylor, and West Taylor sediment ponds. The road has been <br />improved upon from its premine condition to allow equipment access for dredging activities and <br />continued environmental monitoring. The lower reach of the road where it begins off of the <br />paved haul road up to the East Taylor Pond, snakes in and out of the 100’ stream buffer zone off <br />of Taylor Creek. The upper reach from the East Taylor Pond to the West Taylor Pond is almost <br />exclusively within the 100’ stream buffer zone due to steep topography. To date this road has