My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-22_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2024-08-22_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2024 9:35:44 AM
Creation date
8/22/2024 8:04:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
8/22/2024
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
Rule 4 Performance Standards
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-20 Revision Date: 6/24/24 <br /> Revision No.: MR-255 <br />Much of the upper reaches of Taylor Creek above the West Taylor Pond will be directly impacted <br />by the South Taylor Pit, and the permeant West Taylor Fill (see Map 23A). The West Taylor Pond <br />will protect the lower reaches of Taylor Creek that will not be disturbed during mining and <br />reclamation. It is expected that during mining the South Taylor Pit will intercept and hold surface <br />water runoff thus providing less discharge through the West Taylor Pond. Once mining is <br />complete the entire South Taylor Pit will be backfilled and the pre-mine profile and function of <br />the upper reaches of Taylor Creek will be restored. <br /> <br />One best management practice structure (sediment sump) lies within the stream buffer zone on <br />Taylor Creek. This structure manages storm water runoff from the haul road and provides a <br />benefit to Taylor Creek by capturing stormwater runoff from the haul road. This structure is not <br />anticipated to have any impacts to Taylor Creek, and provides a benefit in protecting stormwater <br />runoff to Taylor Creek. <br /> <br />The Taylor Pump Holding Pond was constructed within 100’ of Taylor Creek. The Taylor Pump <br />Holding Pond is utilized to manage water movement from Wilson Reservoir to the active <br />operation; therefore, an underground water pipeline that transports water to and the from the <br />Taylor Pump Holding Pond was also constructed at various locations within 100’ of Taylor <br />Creek as shown on Map 10C. Neither of these structures has impacted Taylor Creek, and neither <br />structure is expected to have any long term impacts to Taylor Creek. <br /> <br />A water diversion structure is constructed in Taylor Creek that allows Colowyo to divert water <br />from Taylor Creek to exercise a water right. This structure would be utilized even if mining was <br />not occurring at Colowyo, as Colowyo is the private surface landowner utilizing a privately held <br />water right structure. <br /> <br />A light use road that was a premine “ranch” road follows along Taylor Creek. This road is <br />utilized to access the West Pit, East Taylor, and West Taylor sediment ponds. The road has been <br />improved upon from its premine condition to allow equipment access for dredging activities and <br />continued environmental monitoring. The lower reach of the road where it begins off of the <br />paved haul road up to the East Taylor Pond, snakes in and out of the 100’ stream buffer zone off <br />of Taylor Creek. The upper reach from the East Taylor Pond to the West Taylor Pond is almost <br />exclusively within the 100’ stream buffer zone due to steep topography. To date this road has <br />not created any adverse impacts to Taylor Creek, and it is not anticipated to have any long term <br />impacts to Taylor Creek. <br /> <br />A light use road along the west side of Taylor Creek to access the 69 kV power line follows <br />along Taylor Creek from the Taylor Pump Holding Pond up to the crossing of Taylor Creek just <br />below the West Pit Pond. This road has been slight improved to access the power line. This <br />road comes into the 100’ stream buffer zone in several locations; however, due to the small <br />extent of the road and minor surface runoff from the road, it is not anticipated to have any long- <br />term impacts to the Taylor Creek. <br /> <br />The raw water pipeline to the Collom operation will be routed across Taylor Creek through an <br />elevated structure. An elevated structure minimizes impacts within the stream buffer zone versus <br />other routing options such as boring the pipeline under Taylor Creek, which requires large