Laserfiche WebLink
LANESTON <br /> CONCRETE INC. <br /> located just to the South West of the settling pond. We have graded the area to drain all water to <br /> the North East for capture of excess water coming off the plant and into the pond to be <br /> recirculated through the wash facility. This will cut down waste and the potential for run-off. <br /> And the last structure is a concrete slab for the wash plant control house to sit on. This was done <br /> for ease of leveling the control house since it is a van trailer and overall cleanliness of the plant. <br /> We plan on leaving these structures in place once the mine is reclaimed in full. Please refer to the <br /> attached Exhibit D Industrial Site Master Plan to reference the lay-out of the proposed post <br /> mining land use. The location of the new wash facility is precariously located somewhere right <br /> on the line between area A and area C. Area A is meant to be a retail yard. And area C set up to <br /> be an"industrial area." We feel that once the process of extracting the C33 sand has subsided, <br /> the concrete structures we built for the wash plant can be purposeful for either storing rock on, <br /> possibly setting some kind of sales store front on, a customer load out station, or something of <br /> the nature. There is some future value in leaving them there. <br /> — <br /> coNCREr€1NC. <br /> 902 South Union Street Florence, Co. 81226 (719) 784-3878 Office (719) 784-1158 Fax <br />