My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-13_REVISION - M1997026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997026
>
2024-08-13_REVISION - M1997026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 7:59:34 AM
Creation date
8/14/2024 7:45:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997026
IBM Index Class Name
Revision
Doc Date
8/13/2024
Doc Name
Request for Technical Revision
From
Carol Ann Pit LLC
To
DRMS
Type & Sequence
TR4
Email Name
LDS
AME
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:FF198071-0762-464A-8202-7F56EEDAED42 <br /> EXHIBIT A <br /> • The Facility Manager(or senior on-site person)must record the call on the Discharge <br /> Notification form in this section and attach a copy to this SPCC Plan. <br /> • The Facility Manager(or senior on-site person)coordinates cleanup and obtains <br /> assistance from a cleanup contractor or other response organization as necessary. <br /> Immediate clean up and control of the spill will be completed within 72 hours of <br /> discovery,with long term clean up coriplete within 30 days.Additional long-term <br /> monitoring will be conducted as needed depending on the type and size of spill. <br /> If the Facility Manager is not available at the time of the discharge,then the designated senior <br /> personnel onsite assumes responsibility for coordinating response activities. <br /> 9_1 Fuel Handling Practices <br /> All fueling at the proposed facility will take place at the fuel farm. Refueling at the fuel farm will <br /> take place at a designated location adjacent to the fuel farm.This location will have an <br /> impermeable floor, such as concrete,that drains back to the secondary containment of the fuel <br /> farm.A spill kit will be maintained at the fuel farm. <br /> 9.2 Other Chemicals <br /> All other chemicals used onsite will be stored in secondary containment with their appropriate <br /> equipment or plant.This includes any and all concrete dyes,concrete cement,asphalt tar,spare <br /> hydraulic fluids,and/or maintenance greases. <br /> 10. Slope Stability <br /> Backfilled and graded portions of the site will be monitored by the operator for slope stability. <br /> All slopes will be graded to 3H:1V or less,which is known to be inherently stable in soils like <br /> those used in typical backfill.During stormwater inspections,personnel will visually check all <br /> backfilled slopes for signs of movement such as sloughing or sliding.Additionally,vegetation of <br /> c said slopes will be visually checked for quality and consistency to prevent slope erosion. <br /> Newby Agg Recycling 19 X b,,x e.ru,ea Mandate..MIA <br /> April 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.