My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-07_PERMIT FILE - M2024043
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024043
>
2024-08-07_PERMIT FILE - M2024043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 9:05:10 AM
Creation date
8/8/2024 8:57:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024043
IBM Index Class Name
Permit File
Doc Date
8/7/2024
Doc Name
Application
From
Harry Corkle Construction
To
DRMS
Email Name
BFB
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RPM.Inc.,25049 E.Alder Dr.,Aurora,(:0 80016 Phone:(303)854-7499 Email:hlhumphries2'comcast.net <br /> EXHIBIT "L" <br /> 6.4.12 Reclamation Cost Information: <br /> We intend to mine and reclaim using a phased approach. A rough estimate is$1,200 per acre.No <br /> extensive grading will be needed. It is likely the Fo soils area will not need to be resoiled since <br /> the subgrade should be adequate for direct seeding once any soil compaction is addressed. There <br /> is excess plant growth material, so it is unlikely any material will need to be brought on to the <br /> site. <br /> We understand the DRMS will calculate a reclamation bond for the first phase,A-1. Soil Unit <br /> GeD which may not be mined is not presently listed as a Phase. However, its actual boundary <br /> and whether or not it contains saleable product will be determined as mining operations occur. It <br /> will likely be used to store excess topsoil so, may be affected land to some degree. It will be <br /> addressed with the DRMS through the Technical Revision process, as appropriate. <br /> Topsoil from A-1 will be placed into the topsoil stockpile in Soil Unit GeD. Topsoil from B-1 <br /> will be used to reclaim Phase 1 (A-1). A-1 will be prepared for seeding and seeded to the <br /> approved seed mix. Little or no A-1 grading should be needed. <br /> Reclamation Phase A-1 =24.4 A. X$1,200/A(estimate)= $29,280. <br /> 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.