Laserfiche WebLink
Findings and Resolution <br /> Stroh Pit Special Review <br /> Page 12 <br /> 36. As-built plans and a certification letter signed and stamped by a professional <br /> engineer must be submitted ,vithin 90 days of installation of the drain. <br /> 37. No bulk storage of diesel fuel, gasoline. solvents, or other potentially hazardous <br /> materials are permitted in the Floodplain limits. <br /> Commissioners Donnelly and Gaiter voted in favor of the Findings and Resolution,and the <br /> same were duly adopted. Commissioner Johnson voted against the Resolution. The Resolution <br /> was duly adopted. <br /> DATED this day of `t a '? 2018. <br /> �t <br /> BOARD OF CO%ANIISSIONERS OF <br /> (�t�� c�':•"""• �F,� LARPMER COUNT'. COLORADO <br /> Chair <br /> (SEAL)© <br /> couo <br /> ATTEST: <br /> Deputy Clerk <br /> LMTE <br /> APPR.ONED UT(7F RM <br /> - r1 <br /> COCtiIY A <br /> 1 <br /> 12 <br />