Laserfiche WebLink
Form 3160-5 UNITED STATES FORM APPROVED <br /> OMB No. 1004-0137 <br /> (June 2013) DEPARTMENT OF THE INTERIOR Expires:January 31,2018 <br /> BUREAU OF LAND MANAGEMENT 5.Lease Serial No. <br /> <br /> SUNDRY NOTICES AND REPORTS ON WEDS 6.If Indian,Allottee or Tribe Name <br /> Do not use this form for proposals to drill or to re-enter an <br /> abandoned well. Use Form 3160-3(APD)for such proposals. <br /> SUBMIT IN TRIPLICATE-Other instructions on page 2 7.If Unit of CA/Agreement,Name and/or No. <br /> 1.Type of Well Wolf Ridge Mining Unit <br /> ❑Oil Well ❑ Gas Well ©Other 8.Well Name and No.18H-IR-WA <br /> 2.Name of Operator 9.API Well No. <br /> Natural Soda LLC <br /> 3a.Address 3200 Rio Blanco County Rd 31 3b.Phone No.(include area code) 10.Field and Pool or Exploratory Area <br /> Rifle,CO.,81650 (970)878-3674 Boies Bed <br /> 4.Location of Well(Footage,Sec., T,R.,M.,or Survey Description) 11.Country or Parish,State <br /> Lat:39.925323 Long:-108,370844 NAD 83-Sec.34,T1S,R98W 698'FNL,388'FEL Rio Blanco County,Colorado <br /> 12.CHECK THE APPROPRIATE BOX(ES)TO INDICATE NATURE OF NOTICE,REPORT OR OTHER DATA <br /> TYPE OF SUBMISSION TYPE OF ACTION <br /> ❑Notice of Intent ❑Acidize ❑Deepen ❑Production(StarVResume) ❑Water shut-Off <br /> ❑Alter Casing ❑Hydraulic Fracturing ❑Reclamation ❑Well Integrity <br /> ❑✓ Subsequent Report ❑Casing Repair ❑New Construction ❑Recomplete ❑Other <br /> ❑Change Plans ©Plug and Abandon ❑Temporarily Abandon <br /> ❑Final Abandonment Notice ❑Convert to Injection ❑Plug Back ❑Water Disposal <br /> 13. Describe Proposed or Completed Operation:Clearly state all pertinent details,including estimated starting date of any proposed work and approximate duration thereof.If <br /> the proposal is to deepen directionally or recomplete horizontally,give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach <br /> the Bond under which the work will be perfonned or provide the Bond No.on file with BLM/BIA.Required subsequent reports must be filed within 30 days following <br /> completion of the involved operations.If the operation results in a multiple completion or recompletion in a new interval,a Form 3160-4 must be filed once testing has been <br /> completed.Final Abandonment Notices must be filed only after all requirements,including reclamation,have been completed and the operator has determined that the site <br /> is ready for final inspection.) <br /> All depths are referenced to GL.The incomplete 18H-IR-WA(formerly the 18H-IR-W)intermediate borehole was determined to be unusable for its <br /> intended purpose and has been plugged and abandoned.Fluid losses in casing were encountered while drilling out the shoe track at 2153'and the drillout <br /> was stopped at 2183'.A cement squeeze was performed(150 bbis,370%excess, 1659'-2183')in an attempt to plug the damaged casing at 1688'and <br /> 2156'.While drilling out the cement plug the casing was milled through at approximately 1686'to 1712% <br /> Plugging and Abandonment:The 9.625'casing was flushed with fresh water and cleaned out with a 6.25"bit to 1,709.4'(native fill 1709.4'to 1712.4').The <br /> 9.625'casing was perforated at depths of 1,620', 1,125',830',360',and 180'.Each perforation interval consists of four 0.38"holes at 90 degree phasing <br /> and 20.5"of penetration. All cement plugs were set using balance method and consisted of 14.6 lb/gal Portland Type IIN cement with High Early <br /> accelerant added. Plug 1 cement consisted of 7.5 cu yds(36 bbis,157.5 sks)was pumped at a depth of 1,701'.Plug 1 was allowed 15.75 hours to set, <br /> after which the top of cement was tagged at 1,328'.Plug 2 consisted of 7.5 cu yds(36 bbls,157.5 sks)was pumped at a depth of 1,306'.Plug 2 was <br /> allowed 6.6 hours of set time,before the top of cement was tagged at 860'. Plug 3 was pumped from a depth of 841'and consisted of 7.5 cu yds(36 bbis, <br /> 157.5 sks).Plug 3 was allowed 16 hours to set,after which the top of cement was tagged at 399'.Plug 4 consisted of 7.0 cu yds(36 bbis,147 sks)was <br /> pumped at a depth of 381'.Cement from Plug 4 reached the surface. The well was dug out at the surface and the casing cut off 3 feet below GL.A <br /> plugged and abandoned hole marker was installed per the Natural Soda UIC permit.The calculated volume of the 1,862'of 9.625"casing is 27.48 cu yds <br /> (132.2 bbis,741.99 cu ft).A total of 29.5 cu yds(141.7 bbis,796.5 cu ft,619.5 sks)of cement,7.4%excess,was used to plug and abandon the <br /> 18H-IR-WA.For additional information please see attached As-Built Plug and Abandonment diagram. <br /> This work was performed under the Colorado Division of Reclamation and Mine Safety permit number M-1983-194. <br /> 14.I hereby certify that the foregoing is true and correct. Name(Printed/Typed) <br /> Gerald J. Daub Title President,Daub&Associates, Inc. <br /> Signature Date <br /> THE SPACE FOR FEDERAL OR STATE OFICE USE <br /> Approved by <br /> Title Date <br /> ------------------------------------------------------------------------ <br /> Conditions of approval,if any,are attached.Approval of this notice does not warrant or <br /> certify that the applicant holds legal or equitable title to those rights in the subject lease Office <br /> which would entitle the applicant to conduct operations thereon. <br /> Title 18 U.S.0 Section 1001 and Title 43 U.S.0 Section 1212,make it a crime for any person knowingly and willfully to make to any department or agency of the United States <br /> any false,fictitious or fraudulent statements or representations as to any matter within its jurisdiction. <br /> (Instructions on page 2) <br />