Laserfiche WebLink
SKiewit RECEIVED <br /> 2 6 L U L4 ALAN LINCOLN <br /> Director of Real Estate <br /> Col:)r ado Division of Reclamation, (402)943-1349 (402)271-2830 fax <br /> Mining and Safety alan.lincoln@kiewit.com <br /> July 25,2024 <br /> Ms. Hunter Ridley <br /> Colorado Division of Reclamation, Mining&Safety <br /> 1001 East 62nd Avenue, Room 215 <br /> Denver,CO 80216 <br /> Sent via E-mail to Hunter.RidleJ©state.eo.us and via FedEx <br /> Subject: Request for Full/Final Release of Entire Permit Area (24.7 acres), <br /> Kiewit Fountain Colony Pit Site (M-1987-171),Fountain, CO 80817 <br /> Dear Ms. Ridley, <br /> Kiewit Infrastructure Co. (Kiewit) is submitting the enclosed Request for Full or Partial Release of Permit <br /> Area/Surety Reduction form and corresponding attachments in support of a request to release the remaining <br /> reclaimed land comprising mining and reclamation area Phase V, which totals 24.7 acres. Upon approval this <br /> request would constitute a full release from the current Reclamation Plan and Permit (Permit#M-1987-171) for <br /> the Fountain Colony Pit located in El Paso County,Colorado. <br /> In support of this full/final release request,the following figure and exhibits delineate the release area: <br /> • Figure 1 -Permit and Affected Land Area Proposed for Release <br /> • Exhibit C- Current Mining Plan Map <br /> • Exhibit F- Current Reclamation Plan Map <br /> Note that an updated permit and affected land area boundary is not shown on Figure 1 since once the release is <br /> approved, there would be no land remaining under Kiewit's permit. <br /> In January of 2023, Kiewit requested the release of 289.2 acres, which comprised the entirety of mining and <br /> reclamation areas Phase 1, Phase Il, Phase III, and Phase IV, which were acquired by Copart as part of an <br /> industrial/commercial development project (Figure 1). The Colorado Division of Reclamation, Mining and <br /> Safety (DRMS) approved the release on April 27, 2023, noting that the only parcel remaining in the permit is <br /> Phase V,which encompasses the 24.7 acres to be released. For background, please refer to the existing Mining <br /> Plan and Reclamation Plan Maps included as Exhibit C and Exhibit F. <br /> In support of the requested final release, the DRMS performed an inspection of the Fountain Colony Pit on July <br /> 17,2024,to review revegetation efforts initiated in 2023 on a 0.5-acre portion of Phase V. The Minerals Program <br /> Inspection Report noted that reclamation across the 24.7 acres appeared adequate for release. <br /> Fountain Colony Pit 1 Kiewit Infrastructure Co. <br /> Request for Full/Final Release of Permit Area <br />