My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-16_HYDROLOGY - M1983194
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1983194
>
2024-07-16_HYDROLOGY - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2024 9:13:21 AM
Creation date
7/17/2024 9:05:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Hydrology
Doc Date
7/16/2024
Doc Name
APD Redrill 18H-IR-W
From
NSI
To
BLM
Type & Sequence
TR50
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Soda LLC Drilling Program <br /> Prognosis Well Completion Information <br /> Well Name: 18H-IR-W <br /> Hole Type: Directional Rotary-Horizontal <br /> Well Type: Injection Well <br /> Well Status: Proposed <br /> Note:All depths referenced below are measured depth(MD)values referenced from ground level(GL)elevation <br /> Proposed Location Data NAD 27, CO 0501;NADCON, GEOID99(CONUS) <br /> GL Elevation,ft: 6684.5 Latitude, °N: 39.925250817 <br /> KB Elevation,ft: 6698.1 Longitude, °W: 108.370220292 <br /> Section: 34 State Plane Northing,ft: 228640.80 <br /> Township: is State Plane Easting,ft: 1195135.58 <br /> Range: 98W NAD 83, CO 0501;NADCON, GEOID99(CONUS) <br /> Qtr/Qtr: NENE Latitude, °N: 39.925223076 <br /> Footage, N/S: TBD Longitude, °W: 108.370866155 <br /> Footage, E/W: TBD State Plane Northing,ft: 1228640.20 <br /> State Plane Easting,ft: 2194975.31 <br /> Conductor Hole Drilling Operation Conductor Casing Data <br /> Hole Diameter, in: 26.0 Casing Depth,ft. GL: 120 <br /> Start Depth,ft. GL: 0.0 Diameter, in: 16 OD; 15.25 ID <br /> End Depth,ft. GL: 120 Type: J55(steel) <br /> Total Footage: 120 Weight: 62.64 Ib/ft <br /> Start Date&Time: TBD Install Date&Time: TBD <br /> End Date&Time: TBD Cement Interval,ft. GL: 0- 120 <br /> Total Drilling Hours: 8 est Cement Type: Portland Type I/II <br /> Drilling Contractor: Triple A Drilling Cement Amount,sks: 12.5 yds est <br /> Rig Number: Ind Cementing Date: TBD <br /> Drilling Media: na Top-off Cement Date: na <br /> Comments: Comments: Install a 60"x 60"cellar and pour-1 foot deep cement floor. <br /> Intermediate Hole Drilling Operation, Primary Intermediate Hole Plug Back Data <br /> Hole Diameter, in: 13.500 Date&Time: na <br /> Start Depth,ft: 120.0 Start Depth,ft: na <br /> End Depth,ft: 2070 est End Depth,ft: na <br /> Total Footage: 1950 est Materials: na <br /> Start Date&Time: TBD <br /> End Date&Time: TBD <br /> Total Drilling Hours: TBD Intermediate Casing Data <br /> Drilling Contractor: Capstar Casing Depth,ft: 2060 est <br /> Rig Number: 330 Casing Diameter, in: 9.625 OD; 8.921 ID <br /> Drilling Media: WBM LSNDBrine Casing Type: J55(steel) <br /> Comments:KOP:900 feet MD GI-est. Casing Wt: 36.0 lb/ft <br /> Install Date&Time: TBD <br /> Comments: Dv tool top:—1400.0 MD GL,est. <br /> ACP tool top:—1600.0 MD GL,est. <br /> Daub&Associates,Inc. 18H-IR-W Redrill <br /> Printed:7/16/2024 Page 1 of 2 Well Completion Prognosis <br />
The URL can be used to link to this page
Your browser does not support the video tag.