My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-15_REVISION - M1994082
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994082
>
2024-07-15_REVISION - M1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2025 11:42:27 AM
Creation date
7/17/2024 7:31:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994082
IBM Index Class Name
Revision
Doc Date
7/15/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Rocky Mountain Excavating, LLC
Type & Sequence
SI2
Email Name
JLC
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Summary <br /> Iron Mountain Road Gravel Permit Action: <br /> Site: Pit 2024Inspection Permit/Job#: M1994092 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 6/17/2024 County: Fremont Filename: M092-000 <br /> User: JLC <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill/Re- adin (3 300-CY Piles) DOZER 1 2.88 $742 <br /> 002 Topsoil Replacement DOZER 1 16.57 $4,261 <br /> 003 Reve etation of 8.43 Acres REVEGE 1 10.00 $16,385 <br /> 004 Mobilization MOBILIZE 7 1 3.54 $1,472 <br /> SUBTOTALS: 32.99 $22,860 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $462 <br /> Performance bond: 1.05 Total= $240 <br /> Job superintendent: 16.50 Total= $1,073 <br /> Profit: 10.00 Total= $2,286 <br /> TOTAL O&P= $4,061 <br /> CONTRACT AMOUNT(direct+O&P)= $26,921 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $1,144 <br /> Reclamation management and/or administration: 5.00 $1,346 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $7,052 <br /> TOTAL BOND AMOUNT(direct+indirect)= $29,912 <br />
The URL can be used to link to this page
Your browser does not support the video tag.