Laserfiche WebLink
9075 WCR 10 <br /> Ft Lupton,Colorado 80621 <br /> Phone: (303)857-1754 Fax: (303)857-2933 <br /> Owner: Holcim Date: 7/9/2024 <br /> 1687 Cole Blvd Project Name: Irwin Thomas-Pit Side Slope Protection <br /> Suite 300 Project Number: N/A <br /> Golden,CO 80401 Bid Date: <br /> Wyatt Webster Proposal Number: 1 <br /> vw att.we b st e r0 h o l c i m.co m <br /> We are pleased to offer our proposal for construction of the above referenced project. <br /> ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL <br /> 100 Mobilization/Demobilization 1 LS $3,660.00 $3,660.00 <br /> 200 Cut Slope to Grade and Fine Grade 850 CY $9.50 $8,075.00 <br /> 300 Install Type 11 Bedding Supplied by Holcim. Estimate Includes Hauling Type 11 430 TON $17.00 $7,310.00 <br /> Bedding from Distel Location. Cost of Material Not Included. <br /> 400 Install Type H Rip Rap Supplied by Holcim. Estimate Includes Hauling Type H 1,450 TON $45.00 $65,250.00 <br /> Rip Rap from Morison oringleside Location(s). Cost of Material Not Included. <br /> TOTAL: $84,295.00 <br />