My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-27_BONDING - C1981018
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981018
>
2024-06-27_BONDING - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 9:41:47 AM
Creation date
7/10/2024 9:39:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Bonding
Doc Date
6/27/2024
Doc Name Note
Findings & Reclamation Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Deserado Mine Permit Action: RN-8 Permit/Job#: C1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 6/26/2024 County: Moffat Filename: C018-000 <br /> User: TJ1 <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Regrade D-Portal Area SCRAPERI 3 83.39 $283,554 <br /> 002 Regrade D-Portal Area DOZER 4 145.14 $267,450 <br /> 003 Regrade Water Storage Areas and Access Road DOZER 4 2.85 $5,351 <br /> 004 Regrade East Portal Ventilation Entry Area and DOZER 4 8.04 $15,098 <br /> Access Road <br /> 005 Regrade Alluvial Well Area and Access Road DOZER 4 1.41 $2,646 <br /> 006 Regrade Overland Conveyor Corridor and DOZER 4 99.77 $187,431 <br /> Maintenance Road <br /> 007 Regrade Slot Storage Area DOZER 4 45.26 $85,019 <br /> 008 Regrade and Topsoil Halandras Landfill DOZER 4 3.65 $6,733 <br /> 009 Regrade Drill Pads,Ponds,Low Cells,Roads and DOZER 4 32.90 $60,633 <br /> Ditches <br /> 010 Recontouring the Haul Road/County Road 65 SCRAPERI 1 6.38 $3,662 <br /> Intersection <br /> Oil Rip Gravel Pad at Rock Dust Facilities Area RIPPER 4 0.39 $743 <br /> 012 Regrade Rock Dust Bin Facility Area DOZER 4 0.58 $1,067 <br /> 013 Regrade Drill Pads from MR's/TR's Approved DOZER 4 26.27 $48,416 <br /> After MT-06 <br /> 014 Backfill and Regrade B-Seam Vent Shaft DOZER 4 1.63 $3,002 <br /> 015 Backfilling Geotech Test Pits DOZER 1 13.11 $804 <br /> 016 Cover RP2/3/4/5a with Subsoil SCRAPERI 3 140.53 $477,855 <br /> 017 Regrade and Cover Refuse Disposal Area RP-1 SCRAPERI 3 4.25 $14,442 <br /> 018 Haul Temporary Refuse from Facilities Area to TRUCKI 1 128.41 $135,032 <br /> RP-2/3/4/5a <br /> 019 Cmpact Refuse at RP 2/3/4,5a,and Facilities Area COMPACT 1 281.95 $81,988 <br /> Refuse <br /> 020 Move and Spread Stockpiled Refuse on RP- SCRAPERI 3 79.85 $271,499 <br /> 2/3/4/5a <br /> 021 Grade Uncom acted Refuse at RP 2/3/4/5a DOZER 4 5.85 $10,776 <br /> 022 Rip Drill Pads and Access Roads RIPPER 4 7.67 $14,417 <br /> 023 Regrade Coal La down Area GRADER 1 0.76 $208 <br /> 024 Rip Parking Lot and Access Road Pavement RIPPER 4 1.63 $3,074 <br /> 025 Remove Parking Lot and Access Road Pavement TRUCKI 1 7.12 $4,331 <br /> 026 Regrade Plant Access/Haul Road Area SCRAPERI 3 60.26 $215,454 <br /> 027 Regrade East Portion of Refuse Haul Road SCRAPERI 3 23.04 $78,329 <br /> 028 Regrade Pond DP-1 and Explosives Storage Area DOZER 4 24.53 $45,196 <br /> and Access Rd <br /> 029 Rip Roadhouse and Coal La down Area Base RIPPER 4 0.79 $1,485 <br /> 030 Regrade Access Road and Vent Shaft DOZER 4 0.16 $287 <br />
The URL can be used to link to this page
Your browser does not support the video tag.