Laserfiche WebLink
REGULATORY AUTHORITY TO COMPLY WITH THE FOLLOWING REQUIREMENTS: <br /> TO IMPLEMENT SEDIMENT CONTROL MEASURES PRIOR TO THE ONSET OF <br /> CONSTRUCTION OF THE COAL TRANSPORT AND STORAGE AREA; TO PROVIDE <br /> EMERGENCY AND PRINCIPAL SPILLWAY OUTLETS WITH APPROPRIATE EROSION <br /> CONTROL PRIOR TO THE CONSTRUCTION OF SEDIMENT PONDS; TO PROVIDE <br /> BAFFLES ON EACH OF THE REFUSE DISPOSAL AREA SEDIMENT PONDS AS <br /> NECESSARY. <br /> Status: This stipulation was satisfied and terminated on September 23, 1981. <br /> Stipulation No. 16: <br /> WITH RESPECT TO VEGETATION RESAMPLING IN THE 1981 FIELD SEASON, SITE 50 <br /> (COLORADO WILDRYE)AND ITS REFERENCE AREA WILL BE SAMPLED FOR <br /> HERBACEOUS COVER AND PRODUCTION. SITE 60 (JUNIPER) WILL BE SAMPLED <br /> FOR SHRUB DENSITY AND FOR PRODUCTION. SITE 41 (SAGEBRUSH-GRASS) AND <br /> SITE 40 (GREASEWOOD-SAGEBRUSH)AND CORRESPONDING REFERENCE SITES <br /> WILL BE SAMPLED FOR PRODUCTION. DATA SUMMARIES AND STATISTICAL <br /> ANALYSES MUST BE SUMITTED TO THE REGULATORY AUTHORITY BY OCTOBER <br /> 1, 1985. THIS SHALL APPLY FOR ALL SAMPLING CONDUCTED DURING 1981. <br /> Status: This stipulation was satisfied and terminated on August 10, 1981. <br /> Stipulation No. 17: <br /> WITH RESPECT TO VEGETATION SAMPLING DURING THE 1981 FIELD SEASON IN <br /> AREAS TO BE DISTURBED BY REFUSE DISPOSAL UNITS 1-4, THE NUMBER OF <br /> SAMPLE CLUSTERS WITHIN EACH VEGETATION TYPE SHALL BE AS SPECIFIED ON <br /> PAGE 24-7 OR ILLUSTRATION PARAMETERS. THE SIZE AND LOCATION OF <br /> PROPOSED REFERENCE SITES MUST BE SUBMITTED TO THE REGULATORY <br /> AUTHORITY WITHIN 30 DAYS OF APPROVAL. THE REFERENCE AREA WHICH <br /> WILL REPRESENT THE AREA PRESENTLY OCCUPIED BY THE CHEATGRASS- <br /> ANNUAL FORB COMMUNITY MUST BE SPECIFIED. <br /> Status: This stipulation was satisfied and terminated on August 10, 1981. <br /> Stipulation No. 18: <br /> DISTURBED ACREAGES OF EACH VEGETATION TYPE AFFECTED BY THE SITES <br /> MENTIONED ON PAGE 24-8 SHALL BE CALCULATED AND SUBMITTED TO THE <br /> REGULATORY AUTHORITY WITHIN 30 DAYS OF APPROVAL. THE NUMBER OF <br /> SAMPLE CLUSTERS REQUIRED WILL BE SET BY THE REGULATORY AUTHORITY <br /> AT THAT TIME. A MAP INDICATING THE SIZE AND LOCATION OF PROPOSED <br /> REFERENCE SITES SHALL ALSO BE SUBMITTED BY THE ABOVE DEADLINE. <br /> Status: This stipulation was satisfied and terminated on August 10, 1981. <br /> xi <br />