Laserfiche WebLink
Stipulation No. 7: <br /> THE APPLICANT MUST ALSO COMMIT TO PROVIDING A MITIGATION PLAN <br /> SHOULD THE EFFECTS OF DRAWDOWN IN THE WHITE RIVER ALLUVIAL AQUIFER <br /> DETRIMENTALLY AFFECT ESTABLISHED AGRICULTURAL ACTIVITIES, EITHER <br /> THROUGH UNFORESEEN IMPACTS OR FROM GROUNDWATER DEPLETIONS WHICH <br /> ARE LARGER THAN EXPECTED. <br /> Status: This stipulation was satisfied and terminated on May 9, 1986. <br /> Stipulation No. 8: <br /> PRIOR TO THE DEVELOPMENT OF MAINS AND SUB-MAINS BENEATH THE <br /> ALLUVIAL BODY OF RED WASH, THE APPLICANT MUST SUBMIT THE <br /> INFORMATION REQUIRED BY SECTION 2.06.8(4) OF THE COLORADO REGULATORY <br /> PROGRAM,ALONG WITH THE PLAN TO ENSURE THAT THE PERFORMANCE <br /> STANDARDS AND MONITORING REQUIREMENTS OF SECTION 4.24 ARE MET. THIS <br /> PLAN MUST ADDRESS THE ANALYSIS OF SUBSIDENCE MONITORING DATA UNTIL <br /> THE SUBMITTALS ARE APPROVED BY THE REGULATORY AUTHORITY. <br /> Status: This stipulation was satisfied and terminated on May 9, 1986. <br /> Stipulation No. 9: <br /> THE APPLICANT MUST ALSO SUBMIT,AS PART OF THE PERMIT APPLICATION, <br /> WRITTEN DOCUMENTATION AS TO THE NATURE OF THE REGIONAL IRRIGATION <br /> INVENTORY PERFORMED. THIS DOCUMENTATION MUST ADDRESS THE <br /> DEFICIENCIES OUTLINED IN SECTION C, SO THAT THE AVF DETERMINATION FOR <br /> SCULLION GULCH CAN BE ADEQUATELY SUBSTANTIATED. THE INFORMATION <br /> SHOULD BE SUBMITTED WITHIN 30 DAYS OF THE GRANTING OF THE PERMIT. <br /> Status: This stipulation was satisfied and terminated on August 10, 1981. <br /> Stipulation No. 10: <br /> THE APPLICANT SHALL PROVIDE THE REGULATORY AUTHORITY WITH A <br /> CORRECTED VERSION OF MAP 77, REFUSE DISPOSAL AREA SITE PREPARATION, <br /> WHICH SHOWS THE LOCATION OF THE CULVERT THAT CARRIES FLOW FROM <br /> THE NON-TOXIC FILL STOCKPILE DITCH ACROSS THE HAUL ROAD INTO THE <br /> SUBAREA R2-3 SEDIMENT POND. THIS INFORMATION SHOULD BE SUBMITTED <br /> WITHIN 90 DAYSOF APPROVAL OF THE MINE PLAN PERMIT. <br /> Status: This stipulation was satisfied and terminated on October 27, 1981. <br /> Stipulation No. 11: <br /> WITHIN 60 DAYS OF APPROVAL OF THE MINING PERMIT, THE APPLICANT SHALL <br /> ix <br />