Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use check one): <br /> LiCropland(CR) —E] Pastureland(PL) General Agriculture(GA) <br /> �✓ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(10 <br /> Developed Water Resources(WR) F Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one : <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> DRangeland(RI,) Forestry(FR) Wildlife Habitat(WI.) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed WaterResources(WIR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Material will be extracted using front end loaders. <br /> 15. On Site Processing: F] Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Excavation wig be performed by front end loaders which will remove and haul the raw resource to a processing plant and will deposit the material in a surge pile A front end loader will deposit the material <br /> from the surge pie eMo the ausldng and screenNg planL <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No designated chemicals or acid-producing materials will be used or stored within the permit area. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation.provide a briefnarrative describing the proposed change(s). <br /> This is a new permit application for a location east of Hasty Colorado. <br />