Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> Cropland(CR) Pastureland(PL) �rT. General Agriculture(GA) <br /> I✓ Rangeland(RL) Forestry(FR) I Wildlife Habitat(WL) <br /> Residenrial(RS) Recreation(RC) Industrial/Commercial(IC) <br /> r� Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one): <br /> F Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> I✓ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> r� Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> I Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): This is a dry mining operation where front end <br /> loaders,dozer do scarpers will remove material from a terrace deposit and load into the processing plant. <br /> 15. On Site Processing: ✓ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Loaders,dozers and scrapers and trucks will be used to <br /> remove material and feed a processing plant that crushes and screens it into stockpiles. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Thic conver-sion to to a and the gravel rawar-we in the permit area by adding 34.50 arpe---to- :the nopth and <br /> west side of the existing permit area. Total permit area will be 44.49 acres more or less. Mining method and <br /> opera ions will remain unchanged wi rec ama ion running concurren y wi mining. <br />