Laserfiche WebLink
. . <br /> 5/5/2011 Page 3 <br /> 1. Cost to Ourav County. Permittee fully understands that all line installation and/or construction <br /> will be performed at no expense whatsoever to Ouray County. <br /> 2. Stop Work. Ouray County shall have the right to order Permittee to stop work anytime Ouray <br /> County believes that a violation of this permit has occurred or if there is a danger to the public <br /> safety if the work continues. <br /> 3. Revocability. Ouray County reserves the right to revoke this permit at any time should Permittee <br /> fail to comply with any of the requirements of this permit. Should this permit be revoked, <br /> Permittee must obtain a new permit and pay all required fees in order to continue with the project <br /> contemplated herein. Any lines or materials installed by Permittee prior to the revocation of the <br /> permit remain the responsibility of Permittee and shall be maintained or removed by Permittee at <br /> the discretion of Ouray County. <br /> 4. Warranty of Right-of-Way. Ouray County does not warrant the right-of-way by the issuance of <br /> this permit. Permittee is responsible for determining the ownership of properties traversed by its <br /> lines,the location of all property boundary lines,and the ownership of all rights-of way. <br /> 5. Commencement of construction prior to payment of fees and granting of approvals will result in <br /> applicable fees being doubled. Construction without inspection is subject to rejection. <br /> 6. Traffic shall be maintained on all rights-of-way. Flaggers shall be provided at any locations where <br /> the orderly flow of traffic is interrupted. <br /> 7. Permittee shall provide all necessary signs and barricades in accordance with the Manual on <br /> Uniform Traffic Control Devices and its latest Colorado Supplement in order to warn oncoming <br /> motorists of any installation or construction work. <br /> 8. In the event any changes are made in the future to the roadway or its appurtenances within the <br /> right-of-way contemplated herein that would necessitate removal or relocation of the lines <br /> installed or constructed herein, Permittee shall do so promptly at its own expense upon the written <br /> request from Ouray County,Colorado. <br /> 9. A copy of this permit shall be maintained on-site at all times until the work has been completed <br /> and inspected. <br /> 10.Permittee shall furnish all labor and materials, perform all work, and pay all costs in connection <br /> with the construction of the driveway(s) and its appurtenances on the right-of-way. All work shall <br /> be completed in an expeditious and safe manner and shall be finished within three months of the <br /> permit date. <br /> 11.This permit does not allow any damage to occur on the existing County right-of-way. If Permittee <br /> causes damage to the County road, Permittee shall repair road to the County's satisfaction. <br /> 12. This permit is valid only for the work described on page one. Any additional work shall require a <br /> separate application and permit. <br /> Mydocumcntvtincnotchmcnt Pcnnitc 2011 <br /> Ouray County Road and Bridge Department <br /> P.O. Box 456, Ridgway CO 81432 970.626.5391 Fax 970.626.4439 ouraycountyco.gov <br />