Laserfiche WebLink
RECEIVED <br /> CALDERA JUN 2 8 2U„, <br /> Mineral Resources <br /> Colorado Division of Reclamation, <br /> Mining and Safety June 24th, 2024 <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Attention: Lucas West <br /> SUBJECT:Caldera Mineral Resources LLC,Technical Revision, Camp Bird Mine, Permit M-1982- <br /> 090 <br /> Dear Mr. West <br /> Please find our submission for Technical Revision("TR”)on behalf of Caldera Mineral Resources <br /> LLC("Caldera"). Our TR requests approval for the Camp Bird Mine(Permit M-1982-090)to export <br /> material to the Revenue Mine (Permit M-2012-032). Only inert surface material at Camp Bird is <br /> being considered for export. For additional information, please refer to TR#17, Revenue Mine, <br /> Permit M-2012-032. For additional clarification, Thorin Resources LLC is the parent company of <br /> Calder Mineral Resources LLC and FAFO Holdings LLC. <br /> For our submittal, the following sections have been provided for review: <br /> 1. Overview <br /> 2. ABA/SPLP Testing for proposed material to export <br /> 3. Handling and Transportation <br /> 4. Source Location <br /> 5. Site Finish <br /> 1. Overview: <br /> We are requesting permission to export material from Camp Bird mine and deliver it to Revenue <br /> Virginius Mine. The material selected is surface material only. There is no intention for sub-surface <br /> excavation,drilling or blasting of material. Further, there is no new additional equipment required <br /> to complete the work. <br /> We have two primary goals for exporting the material: <br /> 1. Assist in site cleanup of material at surface at Camp Bird. <br /> 2. Prove potential economic value of the material by processing the material at the Revenue <br /> Virginius Mine. <br /> 1 <br /> 1900 MAIN ST, UNIT 1 I PO Box 10301 OURAY CO 81427 <br />