Laserfiche WebLink
association with the other material processing and the asphalt plant, asphalt and concrete <br /> recycling operations will also be conducted on-site. <br /> No permanent structures will be established on-site. Employee parking, equipment maintenance, <br /> and equipment storage shall take place near the scale house/office facility. <br /> Commodities to be Mined and Intended Use <br /> Sand and gravel for use as construction materials will be the primary products produced from the <br /> proposed 5J Pit site. Test pits have verified that commercial deposits of sand and gravel exist up <br /> to about 20 or 25 feet below the surface of the ground. In addition to the commercial sand and <br /> gravel materials, clay, silt, and other non-marketable topsoil and overburden materials will be <br /> used on-site for reclamation as needed. <br /> Use of Explosives <br /> Since the material is unconsolidated deposits, no explosives or blasting is required. <br /> 5J Pit <br /> DRMS 112 Permit Application Page 9 <br />