My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-18_HYDROLOGY - M1977436
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977436
>
2024-06-18_HYDROLOGY - M1977436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2024 8:37:18 AM
Creation date
6/21/2024 8:30:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
Hydrology
Doc Date
6/18/2024
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Holcim South Platte Combined SWSP June 18, 2024 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, i± 6243 Page 9 of 26 <br /> In paragraph 6.7.4. of the decree entered in case no. 1996CW658, future farm headgate <br /> deliveries of the 67.75 shares owned by Poudre Prairie Irrigation Company were limited to 1,712 <br /> acre-feet per year (25.26 acre-feet per share) and 12,631 acre-feet (186.43 acre-feet per share) in <br /> any consecutive 10 year period. For the purposes of this one-year SWSP, deliveries of GIC direct flow <br /> water associated with the 3 shares must be limited to a farm headgate delivery of 55.8 acre-feet <br /> (18.6 acre-feet per share). The historical return flows associated with the 3 shares that are the <br /> subject of this SWSP shall be maintained in accordance with the return flow factors identified in case <br /> no. 1996CW658. The return flow obligations will be accounted for and replaced under this SWSP. <br /> For the purposes of this SWSP, you have used a projected yield of 20.31 acre-feet of GIC <br /> direct flow water per share and 1.19 acre-feet of Fossil Creek Reservoir deliveries per share. These <br /> amounts are consistent with projected deliveries per share for Year One as described in paragraph 28 <br /> of the decree entered in case no. 2003CW348. Projected deliveries for Year One were calculated in <br /> accordance with paragraph 20.3.3 of the decree entered in case no. 2003CW99, and are based on <br /> 2002-2006 recorded deliveries. As specified in case no. 1996CW658, all GIC direct flow deliveries <br /> incur an immediate surface return flow obligation of 23.7%, and all Fossil Creek deliveries incur an <br /> immediate surface return flow obligation of 20.1%. The estimated consumptive use credit is <br /> therefore 15.50 acre-feet per share for GIC direct flow water, and 0.95 acre-feet per share for Fossil <br /> Creek Reservoir water. For the purposes of this SWSP, Holcim is assuming that the GIC's 60 preferred <br /> rights in Fossil Creek Reservoir will not be available to GIC during WY2024. Excluding the Fossil Creek <br /> Reservoir component of the GIC deliveries, the projected farm headgate delivery of the 3 shares will <br /> equal 60.93 acre-feet per year (3 shares x 20.31 acre-feet/share), with a return flow obligation of <br /> 27.21 acre-feet. The total consumptive use credit for the 3 shares is therefore projected to equal <br /> 33.72 acre-feet for 2024. <br /> The GIC shares will be delivered back to the river through the 23' Avenue and Fourth Street <br /> Return Station. <br /> Bucklen Equipment Company Lease <br /> The Applicant executed an agreement with Bucklen Equipment Co., Inc. for the lease of <br /> excess augmentation credits from the Bucklen Pit SWSP (WDID 0302538) during the period of April <br /> through October 2024. A copy of the lease, dated December 11, 2023, is attached. The excess <br /> augmentation credits will be generated from six (6) Greeley Irrigation Company shares owned by the <br /> Bucklen Equipment Co., Inc. The return flow obligations associated with the use of the six Bucklen <br /> GIC shares are counted as a depletion in and will be replaced under the Bucklen Pit SWSP. After use <br /> in the Bucklen Pit SWSP, the shares are projected to produce a total of 71.82 acre-feet of excess <br /> credits during the 2024 irrigation season. According to the agreement, Bucklen Equipment Co. will <br /> lease to Holcim as needed any excess augmentation credit available during the 2024 irrigation season <br /> for use. At the time of execution of the agreement, it was anticipated that a total of 71.82 acre-feet <br /> of excess augmentation credit would be available for use in this SWSP. The Bucklen GIC shares will be <br /> delivered to the Cache la Poudre River at the 23rd Avenue and Fourth Street Return Station (WDID <br /> 0302318). <br /> City of Greeley Lease <br /> Holcim has previously entered into a water lease agreement with the City of Greeley under <br /> which Greeley could providefully consumable water for replacement purposes in February 2023. For <br /> 2024, Holcim may lease water from the City of Greeley as needed. The water is discharged to the <br /> Cache la Poudre River from the City's wastewater treatment plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.