Laserfiche WebLink
Holcim South Platte Combined SWSP June 18, 2024 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, &t 6243 Page 18 of 26 <br /> Holcim has previously utilized leased water from the Platte River Power Authority ("PRPA") as <br /> a replacement source in this SWSP. For this SWSP period, the use of leased water from the PRPA is <br /> not necessary and is not proposed to be utilized. In the future, Holcim may use leased water from <br /> the PRPA if a supplemental source of replacement water is needed. <br /> Silver Heights Lease <br /> Holcim seeks the flexibility to use water from this source when needed. The Applicant must <br /> be able to account for and deliver Plum Creek water, including proper accounting and tracking in the <br /> Chatfield Reservoir Daily accounting; augmentation station releases, transit loss, etc. <br /> Zweck Et Turner Ditch <br /> The Applicant seeks to rely on a historical consumptive use analysis previously submitted in <br /> support of the SWSP request for the Fredstrom Pit and included in the 2020 SWSP request, dated May <br /> 29, 2018. The historical consumptive use analysis was accepted for the Fredstrom Pit SWSP for the <br /> purpose of demonstrating that the yield from the subject shares was expected to be sufficient to <br /> offset evaporative depletions from the Fredstrom Pit. The historical consumptive use analysis did not <br /> include evidence that the actual field efficiency (based on historical management and system <br /> properties) achieved the assumed maximum irrigation efficiency of 60% assumed in the report, and is <br /> therefore not acceptable. Prior to the use of the Applicant's interest in the Zweck &t Turner Ditch as <br /> a replacement source, the Applicant must provide a revised historical consumptive use analysis for <br /> the ditch that either uses an assumed maximum irrigation efficiency of 50% or a maximum irrigation <br /> efficiency that considers the site-specific potential efficiency and the effects of installation, <br /> management and maintenance of the irrigation system on the potential irrigation efficiency. In <br /> addition, the SWSP request must clearly define how the maximum irrigation efficiency was <br /> determined, including all assumptions and calculations. <br /> Furthermore, Holcim is in the process of developing an augmentation station for the Zweck &t <br /> Turner Ditch. The Applicant may not use the Zweck &t Turner Ditch as a replacement source in this <br /> SWSP until such time as all required measurement and bypass structures have been installed and <br /> approved by the water commissioner. <br /> Use of Excess Credits <br /> The Applicant has proposed to use excess replacement credit associated with their approved <br /> replacement sources in other gravel pit SWSPs approved pursuant to section 37-90-137(11), C.R.S. or <br /> temporary SWSPs approved pursuant to section 37-92-308(5), C.R.S., to the extent such excess <br /> replacement credit exists. The Applicant must provide written notice to the Division Engineer and <br /> Water Commissioner at least 30 days in advance of the desired commencement of use of the excess <br /> replacement credits, which must include the specific plan in which the credits will be used, the <br /> provision in the plan that allows an unnamed source to be added for credit, the annual and monthly <br /> amount of excess replacement credit available, the location at which the water will be delivered to <br /> the stream, and a copy of a lease agreement between the Applicant and the purchaser of the excess <br /> replacement credits if the additional plan is not owned by the Applicant. The Applicant cannot <br /> claim credit for the use of the excess replacement credits in any other plan until they have <br /> received written approval from the Division Engineer or Water Commissioner. For this plan period <br /> the Applicant requests the ability to lease excess replacement credits for use as a replacement <br /> source in the Stillwater Ski Lake SWSP (Plan ID 6024, WDID 0202850) requested pursuant to section <br /> 37-92-308(5), C.R.S. <br />