Laserfiche WebLink
Table A-10.5A Calculations for time required for topsoiling - Jennings Pit - (with scraper) <br />Jennings Pit <br />Haul Average Production Adjusted* Fleet <br />Route Cubic Distance Grade Rate Production Scraper/Truck Number of Fleet Cost Total <br />From Yards (Ft.) (%) (cyds/hr) (cyds/hr) Hours Scrapers Hours ($/hr) ($) <br /> <br />J23-1 to J-Pit 29,657 950 7.8 220 <br />220 135 8 17 5,615.15$ 94,618.47$ <br />Total 29,657 950 8 220 220 135 3 17 5,615.15$ 94,618.47$