Laserfiche WebLink
Trapper Mine <br />N <br />400 0 400 800 1200 <br />1 2 3 <br />SCALE: 1" = 400' <br />N 402000 <br />N 404000 <br />N 406000 <br />N 408000 <br />N 410000 <br />N 412000 <br />N 400000 E 1436000E 1438000E 1440000E 1442000E 1444000E 1446000E 1436000E 1438000E 1440000E 1442000E 1444000E 1446000N 402000 <br />N 404000 <br />N 406000 <br />N 408000 <br />N 410000 <br />N 412000 <br />N 400000 <br />N 398000N 398000 <br />N 414000 N 414000 <br />Note: Production may fluctuate according to economic, <br />geologic, or other conditions. Limits are shown for <br />maximum possible production from 2024 through 2028. <br />Operations may actually progress slower than depicted <br />on these maps. Backfilling, grading, and topsoil <br />laydown will follow mining operations in a timely <br />manner. <br />CONTOUR INTERVAL : 10' <br />SCALE : 1"=400' <br />Topographic information compiled from 2017 aerial photography and December 2021 Topography from Drone surveys.2023HIGHWALL <br />MINING AREA <br />(EXISTING) <br />PR-11 5 YEAR MINING/RECLAMATION PLAN UPDATE9/30/22 <br />DATE: 11/19/2019 <br />DESIGNED BY: BDN, RDH <br />DRAWN BY: BDN <br />2024 <br />2024 2027 <br />2026 <br />2025 <br />20272023TR-134 6/27/23 WTC C PIT, I Pit EAST, & J PIT DRAGLINE CUTS <br />HIGHWALL <br />MINING <br />L:\ Engineer \ Permits \ TR-135_K Knob_J Pit East \ Maps \ M10 A & B \ M10A_TR-135_KKnob Est_J East Pit.dwg <br />2024 <br />2023 <br />TR-135 2/23/24 WTC L PIT, "K KNOB" EXTENSION