Laserfiche WebLink
Table 1.1. Reclamation Summary for Trapper Mine(2023). <br /> Ashmore Derringer C L Z F N I J Non-pit <br /> Pit Pit Pit Pit Pit Pit Pit Pit Pit Areas Total <br /> New Disturbance Acres <br /> Topsoil Strip Areas 19.7 172.5 31.9 1.5 69.7 33.6 328.9 <br /> Topsoil Pile Areas <br /> Total 0.0 19.7 172.5 31.9 0.0 0.0 0.0 1.5 69.7 33.6 328.9 <br /> Backfilled and Graded Areas 293.9 21.4 14.3 <br /> Total 0.0 293.9 0.0 0.0 0.0 0.0 0.0 21.4 0.0 14.3 329.6 <br /> Topsoil Replacement Areas 239.3 21.4 14.3 <br /> Total 0.0 239.3 0.0 0.0 0.0 0.0 0.0 21.4 0.0 14.3 275.0 <br /> Vegetated(Seeded)Acres <br /> Range Sites A&B 30.7 30.7 <br /> Range Site C 21.4 14.3 35.7 <br /> Perennial Haycrop <br /> Temporary' <br /> Total 0.0 30.7 0.0 0.0 0.0 0.0 0.0 21.4 0.0 14.3 66.4 <br /> Includes topsoil piles,diversion ditches,sediment ponds,drill pads,drainageways,and other temporarily reclaimed lands. <br /> GCR 3/24 <br /> M:\ANNUAL REPORTS\DRMS23RPT\23RECtab1-1 <br />