Laserfiche WebLink
Acreage in Long-term Facilities— <br /> Non-Permanent Facilities—This is the total number of acres that have a facility listed in <br /> Footnote 3 at the bottom of the ARR form that has not been approved in the permit to <br /> remain as permanent. <br /> Permanent Features—This is the total number of acres that have a facility listed in <br /> Footnote 3 at the bottom of the ARR form that has been approved in the permit to remain <br /> as permanent. If the feature is intended to be permanent but has not been approved as <br /> permanent through a permitting action (TR, PR, etc.), then it is not considered permanent. <br /> Acres Seeded— <br /> The acres seeded rows are for permanently seeded acres. Do not enter temporary seeding <br /> of topsoil piles, cover crops, embankment stabilization, etc. <br /> Acres that were seeded during the current reporting year are entered in the "9 Years and <br /> Less" row. <br /> When a parcel becomes seeded for 10 years or greater, subtract the acres from the"9 <br /> Years and Less" row and add it to the "10 Years or Greater" row. <br /> The subtraction column in the"10 Years or Greater" row is for tracking acres transferred <br /> to another permit, acres re-disturbed or corrections associated with record keeping and <br /> mapping. Do not subtract acres where Phase III bond release was achieved. <br /> Bond Release— <br /> This is the total number of acres that have achieved Phase I, II or III bond release for this <br /> permit number, regardless of name changes and changes to the permit boundary. <br /> Acres are added to these categories after DRMS' proposed decision becomes final <br /> (issuance). <br /> The subtraction column is for tracking acres transferred to another permit, acres re- <br /> disturbed or corrections associated with record keeping and mapping. Do not subtract <br /> acres where Phase III bond release was achieved. <br /> Objective— The "Cumulative Total" value in each of these rows will be the same as the <br /> value in "Acres Disturbed—Cumulative Total" when the mine achieves final bond <br /> release. <br /> February 8, 2019 <br />