Laserfiche WebLink
SECTION 6.0 Stock Tank and Dozer Basin Construction Through 2023 <br /> 6.1 Stock Tanks <br /> This section updates the location of all constructed stock tanks through 2023 (Map 1). The average tank <br /> density for Trapper mined-land areas will not exceed one tank per ten acres. Existing stock tanks meet <br /> applicable certification standards. <br /> In 2023 Trapper did not construct any new stock tanks. <br /> 6.2 Dozer Basins <br /> As a result of the approval of technical revision TR-73 (January 1997), dozer basin locations will be <br /> provided in this Appendix W document on an annual basis (Map 1). <br /> Dozer basins assist sediment impoundments in the containment of sediment, reducing the frequency of <br /> sediment impoundment cleaning. Dozer basins are typically constructed along haulroads, regraded <br /> spoils, and/or on short or long term disturbed sites. <br /> GCR 3/24 <br /> [DRMS23RPT\23 PONDS text6-0] <br />