Laserfiche WebLink
Table 5-1. Cont. -page 2 <br /> Topsoil Coordinates Size Approximate Year <br /> Pile ID Location Northing Easting (acres) CYDS Created <br /> JF-1 Jeffway Pond#1 401,578 1,442,426 0.7 1,760 2018 <br /> JG5 Johnson Gulch Elect Station 414,250 1,419,450 0.5 6,209 1989 <br /> JG6 North A Haul Road Johnson 413,000 1,420,950 1.2 13,212 1987 <br /> JG7 North A Haul Road Ag Field W 412,400 1,422,250 0.5 16,850 1988 <br /> JG8 North A Haul Road Ag Field E 412,300 1,422,700 0.7 12,840 1988 <br /> K2-15 K Ridge Reclamation 402,400 1,435,600 7.1 67,082 2015 <br /> L2-17 East Readyline 405,490 1,434,900 2.4 46,485 2017 <br /> L5-17 Road to East Ready Line 405,800 1,435,830 4.5 91,745 2017 <br /> L20-2 K2 Road 404,650 1,438,139 2.0 32,400 2020 <br /> L21-1 L Reclamation 401,726 1,437,812 2.2 49,516 2021 <br /> L21-2 West of Jeffway Pond#1 401,449 1,442,020 1.6 19,502 2021 <br /> L21-3 Northwest on knob, Jeffway Pond#1 402,337 1,442,157 1.7 37,282 2021/2023 <br /> L23-1 L Pit Mid Pit East Side 403,512 1,442,319 4.2 65,437 2023 <br /> MH1 Main haul road north 411,710 1,418,660 1.0 32,147 1986 <br /> MH2 Main haul road south 410,800 1,418,550 2.6 60,251 1982 <br /> MP1 Middle Pyeatt Dam#1 412,200 1,425,030 0.6 4,200 1986 <br /> MP2 Middle Pyeatt Dam#2 413,000 1,425,220 1.2 12,500 1986 <br /> MP7 Middle Pyeatt Sediment Basin 411,000 1,425,400 0.2 645 1991 <br /> N20-2 New LOM Road 408,760 1,431,933 4.3 10,835 2020 <br /> N20-3 New LOM Road 411,300 1,426,940 2.0 19,770 2020 <br /> N20-4 New LOM Road 410,135 1,431,900 1.2 8,659 2020 <br /> N20-5 New LOM Road 410,790 1,431,300 1.8 5,620 2020 <br /> N20-6 New LOM Road 411,340 1,430,530 1.4 9,970 2020 <br /> N20-7 NE of Ash Pond 410,334 1,426,014 0.4 1,713 2020 <br /> N21-1 East Pyeatt, A pit reclaim 410,672 1,427,106 0.9 5,035 2021 <br /> NN20-1 East No-Name#2 410,711 1,416,540 1.6 17,735 2020 <br /> NN20-2 East end I-Pit Overburden Pile 411,282 1,417,835 2.2 38,594 2020 <br /> SP5-94 SW of Sage Pond 412,600 1,430,555 0.6 6,318 1994 <br /> SP6-94 SE of Sage Pond 412,700 1,431,200 0.7 12,204 1994 <br /> SY1 Shop yard pullout expansion 413,660 1,419,250 0.2 900 1990 <br /> WC1 Wye coal pile site 412,600 1,417,500 3.7 74,950 1978 <br /> WB23-1 West Buzzard#4 Pond Topsoil Pile 412,927 1,407,090 0.2 4,033 2023 <br /> EB23-1 East Buzzard#3 Pond Topsoil Pile 413,097 1,408,966 0.4 2,743 2023 <br /> Total 186.1 3,690,889 <br /> * In accordance with MR-155, all of piles A86-6(depleted in 2004), A92-4 and A92-5 were abandoned <br /> and A91-8 and A92-1 were partially abandoned. <br /> In accordance with TR-94, topsoil piles NN1, E89-11, JG-1, JG-2, JG-3, JG-4, WP-2, WP-3, <br /> EP-2, EP-3, EP-4, GP-1, A95-2, FWF97-1, A99-3 and EFL were abandoned. <br /> (1) As of December 31, 2023 <br /> BDN 11/23,GCR 3/24 <br /> [Annual Report\DRMS23RPT\2023 Topsoil Inventory Table 5-1] <br />