SECTION 5.0 Topsoil Stockpile Locations <br /> Trapper's approved permit (Section 4.9.2) specifies that CDRMS will be provided with map(s) illustrating <br /> the location of topsoil stockpiles constructed during the previous year and the approximate locations for <br /> stockpiles proposed for construction during the upcoming year (Map 1). <br /> Table 5-1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br /> approximate center of the pile), acres, construction date and volume; which is updated annually. <br /> During 2023 piles D97-1 and E78-2 were nearly depleted for topsoil laydown in D Pit. Piles D1-07, E78- <br /> 1, E79-4, E79-22A and E87-12 were entirely depleted for topsoil laydown in the D Pit area. Pile 1-20-1 <br /> was depleted for laydown in the eastern I-Pit area. Piles CG1, MH2 and L21-3 had additional topsoil <br /> added to them from stripping operations. Trapper also constructed seven new topsoil piles. Topsoil piles <br /> C23-1, C23-2, C23-3 and C23-4 in the C Pit area; piles D23-1 and D23-2 in the D Pit area and L23-1 in <br /> the L Pit area. Piles J22-1, J22-2, J22-3A and J22-313 were moved for pit advancement to pile CG-1. <br /> Two small piles were also constructed adjacent to the newly constructed East and West Buzzard ponds <br /> in the NW corner of the permit area. <br /> At the end of 2023, excluding stockpiles abandoned with the approvals of MR-155 and TR-94, there are <br /> 81 existing topsoil stockpiles at Trapper affecting 186.1 acres and storing approximately 3,690,889 cubic <br /> yards of salvaged topsoil. <br /> Proposed new topsoil stockpiles near the J and L Pit area may be constructed in 2024. <br /> GCR 3/24 <br /> [Annual Report\DRMS23RPT\23TStext5-0] <br />