Laserfiche WebLink
Cont. <br /> Table 1.2. Re-Disturbed Reclamation Summary for Trapper Mine (2023). Page 2 <br /> Bond Release Status <br /> Parcel Year Re-Disturbed Acres Phase I Phase II Phase III Yearly Total <br /> A-B-91 2023 1.9 1.9 1.9 1.6 <br /> A-C-82 2023 20.6 20.6 20.6 20.6 <br /> A-C-86A 2023 0.3 0.3 0.3 0.3 <br /> A-C-87 2023 7.9 7.9 7.9 7.9 <br /> C R-82 2023 18.1 18.1 18.1 18.1 <br /> C-C-92 2023 11.6 11.6 11.6 11.6 <br /> CR-92 2023 0.2 0.2 0.2 0.2 <br /> C-C-93 2023 24.3 24.3 24.3 24.3 <br /> CR-93 2023 81.8 81.8 81.8 81.8 <br /> CR-94 2023 47.9 47.9 47.9 47.9 <br /> D-B-04 2023 1.6 1.6 1.6 1.6 <br /> D-C-04 2023 5.7 5.7 5.7 5.7 <br /> E-A-83 2023 5.8 5.8 5.8 5.4 <br /> E-A-84 2023 0.6 0.6 0.6 0.5 <br /> E-A-85 2023 0.7 0.7 0.7 0.5 <br /> E-B-83 2023 1.8 1.8 1.8 1.5 <br /> E-B-84 2023 1.4 1.4 1.4 1.4 <br /> E-B-85 2023 0.2 0.2 0.2 0.2 <br /> H-C-03 2023 12.7 12.7 12.7 12.7 <br /> H-C-04 2023 16.2 16.2 16.2 16.2 261.3 <br /> 626.2 612.4 602.4 579.5 Total <br /> Parcel F-AB-07 modifed with SL-24 PHII Bond Release application,previoulsy assumed PHI re-disturbance of 5.1 acres was incorrect. <br /> GCR 3/24 <br /> M:\ANNUAL REPORTS\DRMS23RPT\23RECtab1-2 <br />