My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-17_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2024-06-17_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 8:25:13 AM
Creation date
6/18/2024 8:08:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
6/17/2024
Doc Name Note
Balanced Paid
Doc Name
Request for Technical Revision
From
Thorin Resources LLC
To
DRMS
Type & Sequence
TR17
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ooc`0 <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 1313 Sherman Street, Room 215, Denver,Colorado 80203 ph(303) 866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> Site Name: Revenue Virginus Mine <br /> File No.: M- 2012-32 <br /> County Ouray TR# (DRMS Use only) <br /> Permittee. <br /> Thorin Resources LLC RECEIVED <br /> JUN 17 2024 <br /> Operator(If Other than Permittee): Colorado Division of Reclamation, TR-17 <br /> Chris S ke ri k Mining and Safety <br /> Permittee Representative: LJW/THM <br /> Please provide a brief description of the proposed revision: <br /> Request to create 75 ton / day circuit. Request for import / export of material from Camp Bird <br /> (M 1982 090) to Rcvcnuc Minc <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 fl <br /> 110d, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.