Laserfiche WebLink
-4- <br /> 12. Prima future(Post-mininal land use(check one): <br /> Cropland(CR) LI Pastureland(PL) General Agriculture(GA) <br /> D Rangeland(RL) _0 Forestry(FR) Wildlife Habitat(WL) <br /> -!- r Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primar resent land use check one : <br /> RCropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> BResidential(RS) Recreation(RC) El Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Material will be extracted using front end loaders. <br /> I5. On Site Processing: ill Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Excavation wE be performed by front end loaders which will remove and haul the raw resource to a processing plant and will deposit the material in a surge pile A front end loader will deposit the material <br /> than the nage pile into the crusting and screening plant. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No designated chemicals or acid-producing materials will be used or stored within the permit area. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This is a re-permitting of a previously permitted site. M-2003-002. <br />