Laserfiche WebLink
EXHIBIT F <br /> OTHER PERMITS AND LICENSES REQUIRED <br /> 1 . Application for an Air Pollution permit will not be needed <br /> for this mine since production is not expected to exceed <br /> 70, 000 tons per year. <br /> 2. A Special Use Permit is not needed in Washington County. <br /> 3 . This is an open pit operation and no ground water will be <br /> exposed therefore, a well permit and temporary supply plan <br /> is not needed. <br /> 4 . A dredge fill permit (404) is not required because there are <br /> no waters of the U. S. on this site. <br /> 5. A Storm Water Management Plan (SWMP) will be prepared for <br /> this pit if there is a potential for surface water leaving <br /> the site. <br /> 6. A CPDS permit to cover stormwater runoff and dewatering is <br /> not required, all stormwater will be retained on site and <br /> allowed to soak into the sand substrata. <br /> Zuege Mine, LLC Zuege Pit <br /> June 11, 2024 24 <br />